Put in a couple solid hours today cutting the brackets off the bucket and cleaning it up.
First I welded in some flabar as a spacer at the top. Then I used my 1" spacer blocks to clamp on a guide rail for the plasma torch.
Then zipped the two inner brackets off. Next I cut and tacked in the 2" square cross member to hold position, and a temporary angle at the top as well.
Then it was time to cut the outer ones off too. Not a bad cut, a bit of slag on the backside but it came off easy with a chisel.
There were only a couple small spots I had to hit with the plasma again before it was free.
Then it was time to break out the big guy and clean up the back of the bucket. I was now able to cut the welds and knock the rest of the brackets off.
Now a test fit of the ssqa plate.
Not bad. The back of the bucket is far from flat, so I'm going to spend a bit of time trying to get it flatter with a BFH.
That's it for today. I'll pick up a box of rod on my way home Tuesday, and the weather looks good the rest of the week, so hopefully I'll be able to chip away at it here and there and finish it off by the end of next weekend (I know I've said that a few times now....)