• Scam Alert. Members are reminded to NOT send money to buy anything. Don't buy things remote and have it shipped - go get it yourself, pay in person, and take your equipment with you. Scammers have burned people on this forum. Urgency, secrecy, excuses, selling for friend, newish members, FUD, are RED FLAGS. A video conference call is not adequate assurance. Face to face interactions are required. Please report suspicions to the forum admins. Stay Safe - anyone can get scammed.

A Project Without End

carrdo

Well-Known Member
Hi All,

Remember that what I am about to describe is just for ONE operation on this never ending project.

I will let the photos speak for themselves.

to be continued.
 

Attachments

  • 614 The Northern Boiler Sitting on the Northern Chassis.jpg
    614 The Northern Boiler Sitting on the Northern Chassis.jpg
    194.8 KB · Views: 29
  • 615 The Machined Connection Piece Between the Boiler and the Smokebox.jpg
    615 The Machined Connection Piece Between the Boiler and the Smokebox.jpg
    157.7 KB · Views: 29
  • 616 The Modified (for my mill) Right Angle Milling Attachment.jpg
    616 The Modified (for my mill) Right Angle Milling Attachment.jpg
    177.7 KB · Views: 29
  • 617 The Boiler Lift Saving My Back.jpg
    617 The Boiler Lift Saving My Back.jpg
    168.2 KB · Views: 29
  • 618 The Boiler Now Positioned on the Mill but Not Secured.jpg
    618 The Boiler Now Positioned on the Mill but Not Secured.jpg
    171.8 KB · Views: 29
Last edited:
Hi All,

25+ years of work on and off to date.

I did not make the boiler - it was custom made by one of the best boilermakers in the US. It is all steel welded with rolled in copper tubes.

All of the bits and pieces for the boiler mounting/clamping system had to be invented /made as the boiler was too wide to clamp the boiler directly to the mill's table tee slots.
 

Attachments

  • 625 Firebox Clamp Lower Side View.jpg
    625 Firebox Clamp Lower Side View.jpg
    124.5 KB · Views: 9
  • 624 Firebox Clamp Lower Rear View.jpg
    624 Firebox Clamp Lower Rear View.jpg
    117.2 KB · Views: 10
  • 623 The Firebox Clamp Upper Side View.jpg
    623 The Firebox Clamp Upper Side View.jpg
    161.9 KB · Views: 10
  • 622 The Boiler Clamping Parts.jpg
    622 The Boiler Clamping Parts.jpg
    248.9 KB · Views: 10
  • 621 The Boiler Mounted and Clamped to the Table of the Mill at the Smokebox.jpg
    621 The Boiler Mounted and Clamped to the Table of the Mill at the Smokebox.jpg
    170.5 KB · Views: 10
Hi All,

Boiler alignment which was critical for the one operation.
 

Attachments

  • 626 Checking Level.jpg
    626 Checking Level.jpg
    146.3 KB · Views: 6
  • 627 Checking Level.jpg
    627 Checking Level.jpg
    138.9 KB · Views: 6
  • 628 Checking  Longitudinal Alignment.jpg
    628 Checking Longitudinal Alignment.jpg
    147.6 KB · Views: 6
  • 629 Checking  Longitudinal Alignment.jpg
    629 Checking Longitudinal Alignment.jpg
    128.3 KB · Views: 6
  • 630 Setting Square.jpg
    630 Setting Square.jpg
    139.8 KB · Views: 6
Hi All,

Finally, the actual machining operation. One has to centre the boring head/boring bar and this was done by moving the knee cross slide and the knee height micrometer dials while employing cigarette paper and sweeping the inner circumference with the tip of the boring bar.

The smokebox connecting ring needs to be a very close fit to eliminate any and all outside air leaks as in operation the smokebox has to be under a slight negative pressure and maintained that way to aid in drawing the combustion gases through the boiler tubes. One also needs to apply an anti seize compound to the ring as with such a tight fit, the heating and cooling of the boiler will result in the ring becoming welded in so if ever disassembly is required in the future...
 

Attachments

  • 631 The First Opposite Two High Spots Bored.jpg
    631 The First Opposite Two High Spots Bored.jpg
    142.1 KB · Views: 10
  • 633 First Complete Circular Bore.jpg
    633 First Complete Circular Bore.jpg
    170.8 KB · Views: 10
  • 634 Checking the Wall Thickness for OD Concentricity.jpg
    634 Checking the Wall Thickness for OD Concentricity.jpg
    185.1 KB · Views: 10
  • 635 A Perfect Light Tap Fit of the Joining Ring in the Boiler Shell After Boring.jpg
    635 A Perfect Light Tap Fit of the Joining Ring in the Boiler Shell After Boring.jpg
    173.6 KB · Views: 10
  • 636 The Smokebox Mated to the Boiler.jpg
    636 The Smokebox Mated to the Boiler.jpg
    172 KB · Views: 10
Nice job on the machining. Looks like it stretched your work envelope, but you managed it well, with good creative work holding. Looking forward to seeing this progress. I have an arms length interest in live steam. Meaning that I love seeing others projects and threads on the internet, or in person, but have zero interest in getting involved personally. Too many other interests, and not enough time in a lifetime.
 
Back
Top